Services / 01

Medical Device Software Compliance

Lifecycle processes, risk management and evidence for regulated medical device software. We help teams put IEC 62304-aligned processes in place that their engineers can follow and their documentation can evidence.

Classic V model of the IEC 62304 activities, one common arrangementA classic V model drawn as one common arrangement of IEC 62304 activities; the standard does not require it. Development planning (5.1) comes first. Left side, descending: design inputs (ISO 13485 7.3.3, outside IEC 62304), software requirements (5.2), architectural design (5.3), detailed design (5.4). Bottom: unit implementation (5.5). Right side, ascending: unit verification (5.5), integration testing (5.6), system testing (5.7), design validation (ISO 13485 7.3.7, outside IEC 62304). Dashed links show each test stage checked against its matching design stage. Release (5.8) follows, then software maintenance (clause 6); modifications re-enter the development process (clause 6.3). Cross-cutting throughout: clause 7 risk management, clause 8 configuration management, clause 9 problem resolution.A V model is one common arrangement of the IEC 62304 activities;the standard does not require it.5.1Development planning5.8Release6Maintenancemodifications re-enter (cl. 6.3)validatesDesign inputsISO 13485 §7.3.3Design validationISO 13485 §7.3.7verifies5.2Softwarerequirements5.7System testingverifies5.3Architecturaldesign5.6Integration testing5.4Detaileddesign5.5Unit verification5.5Unit implementationEach test stage is checked against its matching design stageCROSS-CUTTING, THROUGHOUT EVERY ACTIVITYCl. 7 Risk managementLinks to ISO 14971Cl. 8 Configuration managementItems, change control, statusCl. 9 Problem resolutionReports, investigation, trends
Classic V model of the IEC 62304 activities, one common arrangementA classic V model drawn as one common arrangement of IEC 62304 activities; the standard does not require it. Development planning (5.1) comes first. Left side, descending: design inputs (ISO 13485 7.3.3, outside IEC 62304), software requirements (5.2), architectural design (5.3), detailed design (5.4). Bottom: unit implementation (5.5). Right side, ascending: unit verification (5.5), integration testing (5.6), system testing (5.7), design validation (ISO 13485 7.3.7, outside IEC 62304). Dashed links show each test stage checked against its matching design stage. Release (5.8) follows, then software maintenance (clause 6); modifications re-enter the development process (clause 6.3). Cross-cutting throughout: clause 7 risk management, clause 8 configuration management, clause 9 problem resolution.A V model is one common arrangement of theIEC 62304 activities; the standard does notrequire it.STARTS WITH5.1 Development planningENDS WITH5.8 Release, then 6 MaintenanceModifications re-enter development (cl. 6.3)SPECIFY AND DESIGNTEST AND VERIFYDesign inputsISO 13485 §7.3.3Design validationISO 13485 §7.3.75.2Softwarerequirements5.7Systemtesting5.3Architecturaldesign5.6Integrationtesting5.4Detaileddesign5.5Unitverification5.5Unit implementation (bottom of the V)Test stage checked against its design stageCROSS-CUTTING THROUGHOUTCl. 7 Risk managementCl. 8 Configuration managementCl. 9 Problem resolution
Who this is for

Organisations we support.

  • SaMD and digital health companies developing a first regulated software product.
  • Manufacturers adding software, connectivity or AI to an existing device or product line.
  • Teams building AI or machine-learning features into regulated products.
  • Organisations that have inherited or acquired software they now need to place on the market.
Problems we solve

What typically goes wrong.

  • Lifecycle processes written for an audit rather than for how the software is actually developed.
  • Requirements and architecture documented after the code, leaving verification hard to trace.
  • Software safety classification unclear, so the level of rigour is either too low or unnecessarily high.
  • Third-party and open-source components used without SOUP justification or an SBOM.
  • Inherited codebases with no lifecycle records, making regulatory submission unworkable.
What we do

The work we perform.

Software development planning

Defining the software development plan, lifecycle model, deliverables and responsibilities.

IEC 62304 lifecycle processes

Establishing lifecycle processes sized to your safety classification and existing ways of working.

Software safety classification

Determining and documenting the software safety class and its rationale.

Requirements and architecture documentation

Structuring software requirements, architecture and traceability to intended use, risk and verification.

Software risk management

Identifying software contributions to hazards and documenting risk controls in line with ISO 14971.

Verification and validation

Planning verification and validation activities and the records that evidence them.

Configuration and change management

Setting up configuration identification, change control and problem resolution processes.

Release and maintenance

Defining release criteria, release records and the software maintenance process.

Cybersecurity and supporting standards

Applying cybersecurity expectations and supporting standards such as IEC 81001-5-1 to the software lifecycle.

SOUP, open-source and SBOM management

Identifying, justifying and maintaining records for third-party and open-source software, including an SBOM.

AI/ML-enabled software evidence

Defining the development, data and validation evidence expected for AI/ML-enabled functionality.

Inherited or acquired software

Reconstructing lifecycle records and evidence for software you did not originally develop.

Deliverables

What you might receive.

Scope is agreed per engagement — the outputs below are typical examples.

IEC 62304-aligned software development plan and procedures
Software safety classification rationale
Requirements, architecture and traceability structures
Software risk management records
Verification and validation plans, protocols and report templates
Configuration, change and release procedures
SOUP register, OSS assessment and SBOM
Remediation plan for inherited or legacy software
Why integration matters

Our software compliance work is shaped by hands-on experience of developing, verifying and releasing regulated software, so the processes we set up are ones engineering teams can run, and they produce the evidence a reviewer will ask for.

Developing regulated software?

Tell us where your software and its documentation are today and we'll show you where the compliance risk sits.